WellDoneDrill
WellDoneDrill

Size geothermal energy from the design stage.

WellDoneDrill provides the preliminary geological study you need to integrate geothermal energy into your projects from the concept stage — with no risk of unkept promises, and with the technical documents for your permit application.

EPC A with no architectural compromise.

RE2020 imposes very high energy-performance levels for every new permit in France. Closed-loop geothermal is the most effective solution for systematically reaching EPC class A — with no visible outdoor unit, no thermal constraint on the façade and no noise.

Your concept design
Integration from the design stage
Day 1
Geological study
Preliminary report delivered within 72h
72h
EPC A guaranteed
No architectural compromise
EPC A

Six good reasons to integrate geothermal energy into your projects.

EPC A with no architectural compromise

Closed-loop geothermal creates no visual constraint. No outdoor unit, no thermal impact on the façade. Your architectural choices remain intact.

Free preliminary study at concept stage

WDD carries out the subsurface analysis of your projects from the concept stage. You know whether it is feasible before integrating it into your brief.

Documentation for permits and RE2020

We provide the technical documents in the format expected by French planning authorities — ready to integrate directly into your RE2020 thermal calculation note.

Precise sizing, no surprises

Our geological modelling determines exactly the depth and number of boreholes needed. Minimised ground footprint, controlled schedule.

Dedicated technical contact

A WDD engineer follows your project from concept design to handover. Available for your questions, your health & safety coordinators and your MEP engineers.

Native MEP engineering coordination

WDD works regularly with thermal and MEP engineering offices. We provide the geological data and the sizing; the engineering office integrates the heat pump and the network.

Our projects in Belgium

Select a region
We are currently updating our projects for this region.

Your project starts here.

Free geological study, permits, drilling — one team from A to Z. Reply within 48h, no obligation.

Free
Feasibility study
48h
Response time

Your questions as an architect.

Don't see your question here? Contact our team directly.

Ask my question