WellDoneDrill
WellDoneDrill

Size geothermal energy from the design stage.

WellDoneDrill provides the preliminary geological study you need to integrate geothermal energy into your projects from the concept stage — with no risk of unkept promises, and with the technical documents for your permit application.

EPC A with no architectural compromise.

NZEB regulations require ever stricter energy-performance levels for every new permit in Belgium and Luxembourg. Closed-loop geothermal is the only solution that systematically reaches EPC A — with no visible outdoor unit, no thermal constraint on the façade and no noise.

Your concept design
Integration from the design stage
Day 1
Geological study
Preliminary report delivered within 72h
72h
EPC A guaranteed
No architectural compromise
EPC A

Six good reasons to integrate geothermal energy into your projects.

EPC A with no architectural compromise

Closed-loop geothermal creates no visual constraint. No outdoor unit, no thermal impact on the façade. Your architectural choices remain intact.

Free preliminary study at concept stage

WDD carries out the subsurface analysis of your projects from the concept stage. You know whether it is feasible before integrating it into your brief.

Documentation for permits and EPC

We provide the technical documents in the format expected by Belgian and Luxembourg planning authorities — ready to integrate directly into your EPC calculation note.

Precise sizing, no surprises

Our geological modelling determines exactly the depth and number of boreholes needed. Minimised ground footprint, controlled schedule.

Dedicated technical contact

A WDD engineer follows your project from concept design to handover. Available for your questions, your safety coordinators and your MEP engineers.

Native MEP engineering coordination

WDD works regularly with thermal and MEP engineering offices. We provide the geological data and the sizing; the engineering office integrates the heat pump and the network.

Our projects in Belgium

Select a province
New Léonidas factory — Nivelles
Closed-loopIndustrial

New Léonidas factory — Nivelles

Nivelles · Walloon Brabant

CPAS Brussels
Closed-loopPublic

CPAS Brussels

Brussels · Brussels

La Foresterie — Watermael-Boitsfort
Closed-loopResidential

La Foresterie — Watermael-Boitsfort

Watermael-Boitsfort · Brussels

NovaCity II — Anderlecht
Closed-loopResidential

NovaCity II — Anderlecht

Anderlecht · Brussels

Your project starts here.

Free geological study, permits, drilling — one team from A to Z. Reply within 48h, no obligation.

Free
Feasibility study
48h
Response time

Your questions as an architect.

Don't see your question here? Contact our team directly.

Ask my question